Resource Center

Videos and Tutorials

How to install the UTBASE in freshly poured concrete

UTBASE Installation

Video thumbnail

Overview

Use the Campbell Scientific UTBASE to mount the UT20 and UT30 Universal Towers to a concrete base. This video demonstrates two options for installing the base: 1) UTBASE installation with a template frame and 2) UTBASE installation without a template frame. The video is divided into sections. Watch the full video when deciding on the installation method. Once the method is known, use the links in this description to jump directly to the chosen installation section. 00:45 Tools and Site Preparation 01:30 UTBASE Installation With a Template Frame 04:26 UTBASE Installation Without a Template Frame 06:38 Clevis Installation

Connect With Us

envelope icon
Phone Numbers
General: (435) 227-9000
location icon
Corporate Address
815 W 1800 N
Logan, UT 84321
send icon
Email Address
sales@campbellsci.com

As a trusted leader in measurement systems for more than 50 years, our top priority at Campbell Scientific has always been to provide the most accurate, reliable data for research and industry.